Author Topic: June 18  (Read 81 times)

hvkyez49

  • Senior
  • ****
  • Posts: 273
    • View Profile
June 18
« on: December 08, 2013, 08:32:39 pm »
35 fighter improved cost estimates decreased,Ugg Sale
Original title: The U,ugg outlet uk.S. Department of Defense for the F35 fighter improved cost estimates decreased
BEIJING,Ugg Australia, June 18 (Xinhua) According to the China Defense Science and Technology Information Network news, based on a revised estimated cost method to improve the Department of Defense now before 90 F35 fighter improve cost compared to its expected value of the projected 8 months ago value decreased. The costs are expected to update the figures in the last month of the second parallel evaluation costs have been submitted to Congress. Since F35 pilot project carried out in parallel with the production activities, and therefore its parallel cost has been tracking and attention last year, Defense Department officials estimate its initial small batch production (LRIP) 15 batches of 90 aircraft before the contract total cost of parallelism is $ 1,710,000,ugg boots outlet,000 . Since last September on this issue after the first report submitted to Congress, F35 Joint Program Office with Lockheed Martin experts, based on previously known parallel batch LRIP costs and based on previous fighter project (F22,ugg outlet, F/A18E / F, etc.) refine the improved model has been more accurate Parallel cost data of this assessment have been expected to LRIP10, then development activities (and the corresponding defect improvements) will end. All 10 LRIP batches estimated total value of the parallel cost estimate was reduced by about $ 820 million. But this still is expected. Currently the project has only completed about 35% of the flight test, Lockheed Martin and many of the structural durability test done. For each LRIP batches, due to known issues need to be improved increasing proportion of the cost estimates is also increasingly clear. Joint Program Office (JPO) and Lockheed Martin coming to an end LRIP67 batches of contract negotiations, for these contracts to improve the aircraft's projected costs have not yet determined the value. However, the report pointed out that in LRIP 6 of 36 aircraft are known to have 80 of these in parallel to improve Congress have asked for expense reports, because the cost is very high, will significantly increase the real aircraft stand-alone price. Aircraft of the contract in accordance with LRIP5 target price, F35A stand-alone price of about $ 105 million, F35B approximately $ 113 million, F35C approximately $ 125 million. Based on the revised cost estimates parallel, the Defense Department to pay for these improvements to increase approximately $ 10 million per aircraft cost, which is approximately 10% of the price F35A.
相关的主题文章:

Share on Bluesky Share on Facebook